Rki-instruments SDM-E2 Instrukcja Użytkownika Strona 195

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 194
Bump Testing Multiple EAGLE 2s with Different Sensor Configurations 190
If you are bump testing single channel special sensor instruments and do not
have a manifold assembled, the gas order confirmation screen will appear as
shown below. All sensors will be tested using GAS 1. Be sure that each
docking station has a demand flow regulator and the appropriate calibration
cylinder connected to the GAS 1 fitting.
Figure 133: Gas Order Confirmation Screen, Single Channel Units, No Manifold
Przeglądanie stron 194
1 2 ... 190 191 192 193 194 195 196 197 198 199 200 ... 223 224

Komentarze do niniejszej Instrukcji

Brak uwag